The Kentucky Transportation Center has published many reports addressing a variety of transportation issues and problems. Research reports describe the methodology and results for KTC research projects.
Kentucky Transportation Center Research Report has different titles over the years:
- Highway Materials Research Laboratory Research Report: 1939-1966
- Kentucky Department of Highways Research Report: 1967-1975
- Kentucky Department of Transportation Research Report: 1976-1980
- Kentucky Transportation Research Program Research Report: 1981-1988
- Kentucky Transportation Center Research Report: 1988 to present
Submissions from 1998
A Report on County Road Program Finance, Patsy Anderson and Kris Koehler
KTC-98-8
Kentucky Transportation Cabinet's: Annual Assessment of Customer Needs and Satisfaction, Patsy Anderson and Kris Koehler
KTC-98-19
Truck Route Access Evaluation: Edmonson County, From Western Kentucky Parkway to I-65, Lisa Aultman-Hall, Kenneth R. Agent, Brian Aldridge, David Cain, Nicole Lefever, Nikiforos Stamatiadis, and Joel M. Weber
KTC-98-32
Truck Route Access Evaluation: Madison County Industrial Park, Off US 25 South of Richmond, Site #2678, Lisa Aultman-Hall, Kenneth R. Agent, Brian Aldridge, David Cain, Nicole Lefever, Nikiforos Stamatiadis, and Joel M. Weber
KTC-98-31
Truck Route Access Evaluation: Fulton County, Hickman Riverport Area, Site No. 16, Lisa Aultman-Hall, Kenneth R. Agent, Brian Aldridge, David Cain, Nikiforos Stamatiadis, and Joel M. Weber
KTC-98-35
A Methodology for Evaluating Large Truck Access to Intermodal and Other Facilities, Lisa Aultman-Hall, Michael Hill, and Kenneth R. Agent
KTC-98-14
Use of Hydrated Lime Byproduct for Stabilization of Subgrade Soils, Tony L. Beckham and Tommy C. Hopkins
KTC-98-4
Intelligent Transportation Systems Strategic Plan (Phase I Report), Joseph D. Crabtree, Ted H. Grossardt, Donald G. Hartman, Jerry G. Pigman, Jennifer R. Walton, Joel M. Weber, and Study Advisory Committee
KTC-98-9
Field Performance Report on 1219 MM HDPE Pipe on US 127, Owen County, L. John Fleckenstein and David L. Allen
KTC-98-13
Survey and Visual Inspection of Keystone Block Wall and Embankment Slide at Mist Lake Plaza in Lexington, Kentucky, L. John Fleckenstein and David L. Allen
KTC-98-6
Evaluation of Corrugated Steel Pipe Culverts on KY 61, Cumberland County, L. John Fleckenstein, David L. Allen, and Brad W. Rister
KTC-98-7
Evaluation of 93-inch Corrugated Metal Culvert on KY 693 and US 23, Green-Up County, L. John Fleckenstein, Richard Reitenour, and David L. Allen
KTC-98-22
Evaluations of Wall Structures in Kentucky (KYSPR-85-107), L. John Fleckenstein, Brad W. Rister, and David L. Allen
KTC-97-10
Probabilistic Life Cycle Cost Analysis FHWA Demonstration Project DP 115, R. Clark Graves and David L. Allen
KTC-98-24
Experimental Analysis and Analytical Modeling of Bridges With and Without Diaphragms, James J. Griffin, Issam E. Harik, and David L. Allen
KTC-98-12
Seismic Evaluation of the Ohio River Bridge on US51 at Wickliffe, Kentucky, Issam E. Harik, Chelliah Madasamy, Denglin Chen, Leonong Zhou, Kevin Sutterer, Ron Street, and David L. Allen
KTC-98-20
Embankment Construction Using Shale, Tommy C. Hopkins and Tony L. Beckham
KTC-98-2
1998 Highway Cost Allocation Update: Technical Report, Samantha S. Jones and Jerry G. Pigman
KTC-98-3
Kentucky Traffic Accident Facts 1998 Report, Kentucky Transportation Center and Kentucky State Police
Evaluation of Reference Markers, Jerry G. Pigman
KTC-98-23
Investigation and Analysis of Heavy Truck Accidents, Jerry G. Pigman and Kenneth R. Agent
KTC-98-5
Evaluation of Condition-Responsive Work Zone Traffic Controls at the I-75 Clays Ferry Bridge, Jerry G. Pigman, Kenneth R. Agent, and Joel Weber
KTC-98-10
Seismic Isolation of a Highly Skewed, Prestressed Concrete Girder Bridge, Bradley Neil Robson, Issam E. Harik, and David L. Allen
KTC-98-1
Performance Evaluation of Recycled PCC Pavement Used as a Crushed Stone Base and Dense Grade Aggregate, Mike Shull, David L. Allen, L. John Fleckenstein, Clark Graves, and David Q. Hunsucker
KTC-97-3
Cost Estimating and Forecasting for Highway Work in Kentucky (Study KYSPR-94-158), James D. Stevens
KTC-98-18