Archived

This content is available here strictly for research, reference, and/or recordkeeping and as such it may not be fully accessible. If you work or study at University of Kentucky and would like to request an accessible version, please use the SensusAccess Document Converter.

Location

Grand Rapids, Michigan

Start Date

14-5-2024 11:30 AM

End Date

14-5-2024 12:00 PM

Description

Considering the Big Picture: Planning and Designing for a Multiple CCR Landfill Site Authors Mr. Andrew Rodzianko - United States - AECOM Ms. Monica Moody - United States - AECOM Abstract The phasing and design challenges are numerous for any site looking to construct, operate, and close on-site CCR landfills while closing on-site impoundments. In some cases, it may be preferable to build multiple landfills, greatly increasing site-wide phasing, planning, and design elements to be considered. This presentation will review potential benefits and challenges such a site may face and discuss several specific planning and design elements for consideration. Specific examples taken from a site proposing multiple new CCR landfills to receive material from closure-by-excavation of large CCR impoundments will be used with discussion focused on key takeaways potentially applicable to other CCR sites. Some of the aspects to be discussed include: • Benefits and challenges of multiple onsite landfills, • Phasing/constructability challenges as a constant overarching consideration, • Consideration of existing conditions including CCR impoundments, groundwater, and infrastructure to be demolished, • Soil balance planning utilizing onsite sources considering limited storage areas, • Stormwater management: contact vs. non-contact water routing and discharge, • Maintaining and/or maximizing use of existing infrastructure including transmission lines, pipelines, treatment facilities, spillways, dams, and roads, • Site wide multi-landfill leachate management, • Integrating the contractor as a valuable resource in ongoing planning/design.

Document Type

Presentation

Share

COinS
 
May 14th, 11:30 AM May 14th, 12:00 PM

Considering the Big Picture

Grand Rapids, Michigan

Considering the Big Picture: Planning and Designing for a Multiple CCR Landfill Site Authors Mr. Andrew Rodzianko - United States - AECOM Ms. Monica Moody - United States - AECOM Abstract The phasing and design challenges are numerous for any site looking to construct, operate, and close on-site CCR landfills while closing on-site impoundments. In some cases, it may be preferable to build multiple landfills, greatly increasing site-wide phasing, planning, and design elements to be considered. This presentation will review potential benefits and challenges such a site may face and discuss several specific planning and design elements for consideration. Specific examples taken from a site proposing multiple new CCR landfills to receive material from closure-by-excavation of large CCR impoundments will be used with discussion focused on key takeaways potentially applicable to other CCR sites. Some of the aspects to be discussed include: • Benefits and challenges of multiple onsite landfills, • Phasing/constructability challenges as a constant overarching consideration, • Consideration of existing conditions including CCR impoundments, groundwater, and infrastructure to be demolished, • Soil balance planning utilizing onsite sources considering limited storage areas, • Stormwater management: contact vs. non-contact water routing and discharge, • Maintaining and/or maximizing use of existing infrastructure including transmission lines, pipelines, treatment facilities, spillways, dams, and roads, • Site wide multi-landfill leachate management, • Integrating the contractor as a valuable resource in ongoing planning/design.