Subscribe to RSS Feed (Opens in New Window)

Schedule
2017
Thursday, May 11th
8:00 AM

A Comparison of Actual vs. Predicted Leachate Generation

Cedric H. Ruhl
Chris Jordan

Lexington, KY

8:00 AM - 8:30 AM

8:00 AM

Groundwater Monitoring Requirements of the CCR Rule - What's Next?

Tom Mann
Kathy Webb

Lexington, KY

8:00 AM - 8:30 AM

8:30 AM

A Solution to Ponded Coal Ash

Kunigal Shivakumar
Wade Brown
Kazi Imran

Lexington, KY

8:30 AM - 9:00 AM

8:30 AM

Action Leakage Rate Calculation

Christopher S. Jordan
Cedric H. Ruhl

Lexington, KY

8:30 AM - 9:00 AM

8:30 AM

CCP Dewatering Using a Horizontal Well

Ryan J. Baeten
Julie A. Zimdars
Leif Tolokken
Michael Lubrecht

Lexington, KY

8:30 AM - 9:00 AM

8:30 AM

Challenges of Monitoring Groundwater at CCR Sites in Karst Terrain

Thomas M. Reed
Alison L. Dunn
Nicholas G. Schmitt

Lexington, KY

8:30 AM - 9:00 AM

8:30 AM

Solar Options to be Used on Utility's Ash Ponds

Gretchen Dolson
Duke Kuvaas

Lexington, KY

8:30 AM - 9:00 AM

9:00 AM

Case History – CCR Landfill Cover System Stormwater and Infiltration Water Design and Management

Kenneth R. Daly
Cedric Ruhl
Mark Shumpert

Lexington, KY

9:00 AM - 9:30 AM

9:00 AM

In-Situ Solidification and Stabilization of CCR: Potential Applications and Cost Analysis

Margaret Carrillo-Sheridan
Benjamin Gallagher
James Redwine
Dimitri Vlassopoulos

Lexington, KY

9:00 AM - 9:30 AM

9:00 AM

Utilizing Alternative Caps that meet Subtitle D Equivalency Requirements for CCR Landfill and Impoundment Closures to Gain Significant Savings and Secondary Use Opportunities

Mark Roberts
Steven Flanders

Lexington, KY

9:00 AM - 9:30 AM

9:30 AM

Post-Closure Observations At Fly Ash Impoundments

Pedro J. Amaya

Lexington, KY

9:30 AM - 10:00 AM

9:30 AM

Recent Insights into Mechanically-Enhanced Evaporation of Mine Affected Waters

Daniel M. Couton
Joane C. Timones

Lexington, KY

9:30 AM - 10:00 AM

9:30 AM

Using the Conceptual Site Model to Tackle the $64,000 Questions Surrounding Groundwater Monitoring and Corrective Action

Carla Landrum
Jim Field
Tim Glover

Lexington, KY

9:30 AM - 10:00 AM

10:30 AM

AEP’s CCR Impoundment Closure Projects - Lessons Learned, Insights & Exemplary Practices

Guy Cerimele

Lexington, KY

10:30 AM - 11:00 AM

10:30 AM

Sustainable Closure of Fly Ash Impoundments

Al Briggs
Jacob Catt
Ron Froh
Jay Clayton

Lexington, KY

10:30 AM - 11:00 AM

10:30 AM

We Don't Have No Stinkin' Dirt! Coal Ash Pond Closures - (Traditional and an Alternative Method)

Rosanna M. Saindon

Lexington, KY

10:30 AM - 11:00 AM

10:30 AM

Working Through Location Restrictions to Expand the Ottumwa Midland Landfill

Eric Nelson Nelson
Lindsay Motl

Lexington, KY

10:30 AM - 11:00 AM

11:00 AM

Modeling Potential Benefits to Groundwater Resulting From Various Surface Impoundment Closure Options

Andrew Bittner
John Kondziolka

Lexington, KY

11:00 AM - 11:30 AM

11:00 AM

Practical Considerations for CCR Facility Design, Operations, and Maintenance

Joshua M. Bell
Kenneth R. Daly
Mark Shumpert

Lexington, KY

11:00 AM - 11:30 AM

11:00 AM

Wet-To-Dry Conversions

Gerald Long

Lexington, KY

11:00 AM - 11:30 AM

11:30 AM

Evaluating Compatibility of CCR with Leachate Collection System to Insure Rule Compliance

Brian Cole
Jeff Kuhn

Lexington, KY

11:30 AM - 12:00 PM

11:30 AM

GCL Chemical Compatibility Testing with CCR Landfill Leachate

Jason D. Ross
Michael G. Rowland

Lexington, KY

11:30 AM - 12:00 PM

11:30 AM

Work Area Quantification to Guide CCR Construction Closure Programs

Dale W. Evans
Kathleen Whysner

Lexington, KY

11:30 AM - 12:00 PM

1:00 PM

CCR Microparticulates and the Trouble They Cause

Linxi Chen
Jacques Smith
Duane Graves
Scott Sheridan

Lexington, KY

1:00 PM - 1:30 PM

1:00 PM

Coal Combustion Residual (CCR) Groundwater Data Evaluation: From Monitoring to the Right Remediation Path

Bryon Dahlgren
Douglas R. Gray

Lexington, KY

1:00 PM - 1:30 PM

1:00 PM

Mitigating Hydrogen Sulfide Issues at Coal Combustion Residuals and Municipal Solid Waste Co-disposal Sites

Jeff Marshall Marshall

Lexington, KY

1:00 PM - 1:30 PM

1:00 PM

Opportunities for CCR Management with Geotextile Tubes

Christopher Timpson

Lexington, KY

1:00 PM - 1:30 PM

1:00 PM

Recent Experience in In Situ Dewatering of Coal Combustion Residuals: A Practical Approach

Gregory M. Landry
Paul C. Schmall

Lexington, KY

1:00 PM - 1:30 PM

1:00 PM

Using Mercury Capture Systems with Fly Ash for Cement Manufacturing

Melissa Harrison
Christopher Poling
Thomas Lesniak

Lexington, KY

1:00 PM - 1:30 PM

1:30 PM

Coal Ash Use Study for Duke Energy, North Carolina

Anne Oberlink
Tom Robl
Bob Jewell
Ken Ladwig

Lexington, KY

1:30 PM - 2:00 PM

1:30 PM

Environmental Risk Assessments of Coal Ash Impoundments

Matt Huddleston
Kathy Web

Lexington, KY

1:30 PM - 2:00 PM

1:30 PM

Geosynthetic Reinforcement in Surface Impoundment Closure

John D. Herrmann
Steve Gale

Lexington, KY

1:30 PM - 2:00 PM

2:00 PM

Effect of Moisture Conditioning and Handling on Leaching and Physical Properties of Sodium Bicarbonate Flue Gas Desulfurization Materials

Jonathan N. Hotstream
Robert Stanforth
Douglas R. Genthe
Curtis Madsen

Lexington, KY

2:00 PM - 2:30 PM

2:00 PM

Feasibility of Coal Ash Utilization from Pecém Power Plant Landfill in Concrete

Thays G. Araújo
Antonio Eduardo Cabral

Lexington, KY

2:00 PM - 2:30 PM

2:30 PM

Statistically Significant Exceedance-Understanding False Positive Error

Arun Kammari

Lexington, KY

2:30 PM - 3:00 PM

2:30 PM

Structural Considerations for In-Place Closure of CCR Impoundments

Don Grahlherr
Christopher Lewis

Lexington, KY

2:30 PM - 3:00 PM