A Comparison of Actual vs. Predicted Leachate Generation Cedric H. Ruhl Lexington, KY 8:00 AM - 8:30 AM |
|
---|---|---|
8:00 AM |
Groundwater Monitoring Requirements of the CCR Rule - What's Next? Tom Mann Lexington, KY 8:00 AM - 8:30 AM |
|
8:30 AM |
Kunigal Shivakumar Lexington, KY 8:30 AM - 9:00 AM |
|
8:30 AM |
Action Leakage Rate Calculation Christopher S. Jordan Lexington, KY 8:30 AM - 9:00 AM |
|
8:30 AM |
CCP Dewatering Using a Horizontal Well Ryan J. Baeten Lexington, KY 8:30 AM - 9:00 AM |
|
8:30 AM |
Challenges of Monitoring Groundwater at CCR Sites in Karst Terrain Thomas M. Reed Lexington, KY 8:30 AM - 9:00 AM |
|
8:30 AM |
Solar Options to be Used on Utility's Ash Ponds Gretchen Dolson Lexington, KY 8:30 AM - 9:00 AM |
|
9:00 AM |
Case History – CCR Landfill Cover System Stormwater and Infiltration Water Design and Management Kenneth R. Daly Lexington, KY 9:00 AM - 9:30 AM |
|
9:00 AM |
In-Situ Solidification and Stabilization of CCR: Potential Applications and Cost Analysis Margaret Carrillo-Sheridan Lexington, KY 9:00 AM - 9:30 AM |
|
9:00 AM |
Mark Roberts Lexington, KY 9:00 AM - 9:30 AM |
|
9:30 AM |
Post-Closure Observations At Fly Ash Impoundments Pedro J. Amaya Lexington, KY 9:30 AM - 10:00 AM |
|
9:30 AM |
Recent Insights into Mechanically-Enhanced Evaporation of Mine Affected Waters Daniel M. Couton Lexington, KY 9:30 AM - 10:00 AM |
|
9:30 AM |
Carla Landrum Lexington, KY 9:30 AM - 10:00 AM |
|
10:30 AM |
AEP’s CCR Impoundment Closure Projects - Lessons Learned, Insights & Exemplary Practices Guy Cerimele Lexington, KY 10:30 AM - 11:00 AM |
|
10:30 AM |
Sustainable Closure of Fly Ash Impoundments Al Briggs Lexington, KY 10:30 AM - 11:00 AM |
|
10:30 AM |
We Don't Have No Stinkin' Dirt! Coal Ash Pond Closures - (Traditional and an Alternative Method) Rosanna M. Saindon Lexington, KY 10:30 AM - 11:00 AM |
|
10:30 AM |
Working Through Location Restrictions to Expand the Ottumwa Midland Landfill Eric Nelson Nelson Lexington, KY 10:30 AM - 11:00 AM |
|
11:00 AM |
Andrew Bittner Lexington, KY 11:00 AM - 11:30 AM |
|
11:00 AM |
Practical Considerations for CCR Facility Design, Operations, and Maintenance Joshua M. Bell Lexington, KY 11:00 AM - 11:30 AM |
|
11:00 AM |
Gerald Long Lexington, KY 11:00 AM - 11:30 AM |
|
11:30 AM |
Evaluating Compatibility of CCR with Leachate Collection System to Insure Rule Compliance Brian Cole Lexington, KY 11:30 AM - 12:00 PM |
|
11:30 AM |
GCL Chemical Compatibility Testing with CCR Landfill Leachate Jason D. Ross Lexington, KY 11:30 AM - 12:00 PM |
|
11:30 AM |
Work Area Quantification to Guide CCR Construction Closure Programs Dale W. Evans Lexington, KY 11:30 AM - 12:00 PM |
|
1:00 PM |
CCR Microparticulates and the Trouble They Cause Linxi Chen Lexington, KY 1:00 PM - 1:30 PM |
|
1:00 PM |
Bryon Dahlgren Lexington, KY 1:00 PM - 1:30 PM |
|
1:00 PM |
Jeff Marshall Marshall Lexington, KY 1:00 PM - 1:30 PM |
|
1:00 PM |
Opportunities for CCR Management with Geotextile Tubes Christopher Timpson Lexington, KY 1:00 PM - 1:30 PM |
|
1:00 PM |
Recent Experience in In Situ Dewatering of Coal Combustion Residuals: A Practical Approach Gregory M. Landry Lexington, KY 1:00 PM - 1:30 PM |
|
1:00 PM |
Using Mercury Capture Systems with Fly Ash for Cement Manufacturing Melissa Harrison Lexington, KY 1:00 PM - 1:30 PM |
|
1:30 PM |
Coal Ash Use Study for Duke Energy, North Carolina Anne Oberlink Lexington, KY 1:30 PM - 2:00 PM |
|
1:30 PM |
Environmental Risk Assessments of Coal Ash Impoundments Matt Huddleston Lexington, KY 1:30 PM - 2:00 PM |
|
1:30 PM |
Geosynthetic Reinforcement in Surface Impoundment Closure John D. Herrmann Lexington, KY 1:30 PM - 2:00 PM |
|
2:00 PM |
Jonathan N. Hotstream Lexington, KY 2:00 PM - 2:30 PM |
|
2:00 PM |
Feasibility of Coal Ash Utilization from Pecém Power Plant Landfill in Concrete Thays G. Araújo Lexington, KY 2:00 PM - 2:30 PM |
|
2:30 PM |
Statistically Significant Exceedance-Understanding False Positive Error Arun Kammari Lexington, KY 2:30 PM - 3:00 PM |
|
2:30 PM |
Structural Considerations for In-Place Closure of CCR Impoundments Don Grahlherr Lexington, KY 2:30 PM - 3:00 PM |