Abstract

The purpose of this study was to document the construction procedures and evaluate the effectiveness of wick drains as a foundation stabilization method. Field data was primarily obtained from field surveys and penumatic piezometers installed in the approach foundation.

Construction procedures used have been determined to be generally acceptable. The wick drains appear to have effectively dewatered the foundation during embankment construction.

Report Date

10-1987

Report Number

UKTRP-87-24

Digital Object Identifier

http://dx.doi.org/10.13023/KTC.RR.1987.24

Notes

The contents of this report reflect the views of the authors who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the University of Kentucky, the Kentucky Transportation Cabinet, nor the Federal Highway Administration. This report does not constitute a standard, specification, or regulation. The inclusion of manufacturer names and tradenames are for identification purposes and are not to be considered as endorsements.

Share

COinS