Archived

This content is available here strictly for research, reference, and/or recordkeeping and as such it may not be fully accessible. If you work or study at University of Kentucky and would like to request an accessible version, please use the SensusAccess Document Converter.

Abstract

Construction and performance evaluations of Hydraway Drain and Conventional Pavement Edge Drain are presented. Construction procedures, laboratory tests, and discharge data, are included.

Report Date

7-1987

Report Number

UKTRP-87-17

Digital Object Identifier

http://dx.doi.org/10.13023/KTC.RR.1987.17

Notes

The contents of this report reflect the views of the authors who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the University of Kentucky, the Kentucky Transportation Cabinet, nor the Federal Highway Administration. This report does not constitute a standard, specification, or regulation. The inclusion of manufacturer names and tradenames are for identification purposes and are not to be considered as endorsements.

Share

COinS