Abstract

On September 28, 1989, the Kentucky Transportation Cabinet requested the Kentucky Transportation Center (KTC) to investigate an apparent drainage problem on the Mountain Parkway. The area of concern was a rehabilitation project starting at Milepost 16 and ending at the Stanton exit (Milepost 22). The old PCC pavement was being broken and seated and then overlaid with approximately nine inches of asphaltic concrete. Longitudinal edge drains Advanedge and Contech Stripdrain 100 had been installed prior to the breaking and seating.

Report Date

10-1989

Report Number

KTC-89-50

Digital Object Identifier

http://dx.doi.org/10.13023/KTC.RR.1989.50

Notes

The contents of this report reflect the views of the authors who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the University of Kentucky, nor the Kentucky Transportation Cabinet. This report does not constitute a standard, specification, or regulation. The inclusion of manufacturer names and tradenames are for identification purposes and are not to be considered as endorsements.

Share

COinS