Abstract

Presented herein are analyses of 6 bridge approaches. Lateral movement and settlement of the foundations and embankments are discussed. Result·s of slope stability and finite element analyses are related to measured movements. A graph for predicting approach pavement settlement is included. A theoretical approach model was used to run an extensive series of finite element analyses. Movements resulting from these analyses are presented with several variable model conditions. Variable conditions include embankment and foundation configuration, soil cohesion, and soil friction angle.

Report Date

8-1988

Report Number

UKTRP-88-15

Digital Object Identifier

http://dx.doi.org/10.13023/KTC.RR.1988.15

Notes

The contents of this report reflect the views of the authors who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the University of Kentucky, the Kentucky Transportation Cabinet, nor the Federal Highway Administration. This report does not constitute a standard, specification, or regulation. The inclusion of manufacturer names and tradenames are for identification purposes and are not to be considered as endorsements.

Share

COinS