Abstract

This report describes the development of Kentucky’s Statewide Intelligent Transportation Systems (ITS) Architecture. The process began with the development of an ITS Strategic Plan in 1997-2000. A Business Plan, developed in 2000-2001, translated the goals of the Strategic Plan into specific project recommendations. To develop the Statewide Architecture, the project team first inventoried all existing and planned ITS projects in the state. A project architecture was developed for each identified project, and these project architectures were then merged to form the Statewide Architecture. This report describes the background work that set the stage for the architecture, the actual architecture development process, and some of the key issues and challenges faced during the development. In addition, this report provides a description of the actual deliverables that resulted from the architecture development.

Report Date

6-2003

Report Number

KTC-03-08/SPR188-98-2F

Digital Object Identifier

http://dx.doi.org/10.13023/KTC.RR.2003.08

Notes

The contents of this report reflect the views of the authors, who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the University of Kentucky or the Kentucky Transportation Cabinet. This report does not constitute a standard, specification, or regulation. The inclusion of manufacturer names or trade names is for identification purposes only and is not to be considered an endorsement.

Share

COinS