Abstract

The objectives of this study were to develop specifications and contract language and to monitor the implementation them to effectively use rapid reconstruction and extended service life concepts in new bridge construction. Through the use of A + B bidding, a duplex protective coating system using Hot Dipped Galvanizing (HDG) and paint, and preservation techniques such as concrete sealers and stains the Kentucky Transportation Cabinet attained those goals.

Report Date

1-2016

Report Number

KTC-16-28/FRT200-1F

Digital Object Identifier

https://doi.org/10.13023/ktc.rr.2016.28

Notes

© 2020 University of Kentucky, Kentucky Transportation Center

Information may not be used, reproduced, or republished without KTC’s written consent.

The contents of this report reflect the views of the authors, who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the University of Kentucky, the Kentucky Transportation Center, the Kentucky Transportation Cabinet, the United States Department of Transportation, or the Federal Highway Administration. This report does not constitute a standard, specification, or regulation. The inclusion of manufacturer names or trade names is for identification purposes and should not be considered an endorsement.

Share

COinS