Abstract

Recently Mr. J.O. Cornell requested the assistance of the Drainage Section of the Research Laboratory in investigating the channel that the U.S. Corps of Engineers has designed in conjunction with the raising of Dam No. 39 and the changing of the locking system. The principal reason for this investigation was to determine the effect, if any, that this project will have upon the five-span highway bridge on U.S. 42, located approximately two thousand feet upstream from the confluence of Stephens Creek and the Ohio River and at the upstream end of the new channel.

Report Date

3-1956

Report Number

No. 113

Digital Object Identifier

http://dx.doi.org/10.13023/KTC.RR.1956.113

Share

COinS