Abstract

The Research Division assisted the District Construction personnel with structural repairs of five areas of cement concrete pavement that had been adjudged unsatisfactory. I had an opportunity to observe the repaired areas on July 19, 1962, and they all appear to be performing. adequately. The color of the epoxy patching material does not completely match the adjacent concrete but with normal weathering the two materials should approach a better match.

Report Date

6-1962

Report Number

No. 190

Digital Object Identifier

http://dx.doi.org/10.13023/KTC.RR.1962.190

Share

COinS