Abstract

The objective of this study was to monitor placement and evaluate performance of continuously reinforced concrete pavement with an emphasis on determining the time of cracking and crack interval. This paper reports on the design and construction practice for CRCP in Kentucky. Data on crack frequency and time of cracking is also included in an attempt to further explain the cracking pattern associated with CRCP.

Report Date

10-1-1977

Report Number

No. 480

Digital Object Identifier

http://dx.doi.org/10.13023/KTC.RR.1977.480

Notes

The contents of this report reflect the views of the authors who are responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Bureau of Highways. This report does not constitute a standard, specification, or regulation.

Share

COinS