Abstract

This document serves as the final report on the construction and opening of the Roundabout Project in London, Kentucky (Kentucky Item Number 11‐904.1). This project (hereafter referred to as the London Roundabout) was constructed on the authority of the Kentucky Transportation Cabinet (KYTC), which received an Accelerated Innovation Deployment (AID) Demonstration grant of $1 million to offset project construction costs. The AID Demonstration program requires that award recipients submit a final report to the Federal Highway Administration (FHWA) within six months of project completion. The purpose of this report is to document the project delivery and construction processes, benefits, and lessons learned, which includes development and/or refinement of guidance, specifications, or other tools and methods that could be used to adopt the roundabout innovation as standard practice.

Report Date

11-2017

Report Number

KTC-17-24/HSIP16-1F

Digital Object Identifier

https://doi.org/10.13023/KTC.RR.2017.24

Notes

© 2017 University of Kentucky, Kentucky Transportation Center

Information may not be used, reproduced, or republished without KTC’s written consent.

The contents of this report reflect the views of the authors, who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the University of Kentucky, the Kentucky Transportation Center, the Kentucky Transportation Cabinet, the United States Department of Transportation, or the Federal Highway Administration. This report does not constitute a standard, specification, or regulation. The inclusion of manufacturer names or trade names is for identification purposes and should not be considered an endorsement.

Share

COinS